(206) 555-0172

Home / Pricing and financing

One price, in writing, before demolition.

Remodels vary too much for a menu, but not so much that you should go in blind. Here is how projects are grouped, what moves the price, and how the contract protects you.

Kitchen

  • Refresh

    Same layout. New cabinet fronts or boxes, counters, backsplash, lighting.

    Plumbing, gas and walls stay where they are.

    From $___k, set by owner
  • ReworkOur usual recommendation

    Layout changes inside the room. New cabinets, counters, flooring, electrical.

    Walls stay; plumbing and gas may move.

    From $___k, set by owner
  • Gut and rebuild

    Walls open or move. Everything new, down to the studs and the subfloor.

    Nothing is off the table.

    From $___k, set by owner

Bathroom

  • Refresh

    Same footprint. New vanity, toilet, fixtures, tile surround and lighting.

    Drains and walls stay.

    From $___k, set by owner
  • ReworkOur usual recommendation

    Gutted to the studs. New waterproofing, tile, shower and fan ducted outside.

    Drains mostly stay.

    From $___k, set by owner
  • Gut and rebuild

    Layout changes, curbless shower, heated floor, drains moved.

    Nothing is off the table.

    From $___k, set by owner

Whole home

  • One floor

    Main floor opened up: kitchen, living, dining, systems on that level.

    Upstairs and basement stay as they are.

    From $___k, set by owner
  • Phased houseOur usual recommendation

    Whole house designed once, built in two or three priced phases.

    Each phase fixed before it starts.

    From $___k, set by owner
  • Full gut

    The house taken to the studs and rebuilt, systems and all.

    You live elsewhere for the build.

    From $___k, set by owner

How the fixed price works

  • Design is priced separately and in writing before it starts.
  • The build is priced line by line from the finished drawings and selections.
  • You sign one scope at one price before demolition.
  • Anything found behind a wall comes to you with photos and a price on a change order. Nothing changes without your signature.
  • Payments follow milestones you can see, not dates on a calendar.

What moves the price

  • Moving walls, plumbing or gas
  • Custom versus semi-custom cabinets
  • Counter material and edge detail
  • Appliance package
  • What we find behind the walls in an older house
  • Moving the toilet or shower drain
  • Tile size and pattern
  • Glass: fixed panel or door
  • Heated floor and towel warmer

Start my remodel

Step 1 of 3

What are we remodeling?